45 m3 floor slab
A nice one day project (Phase 1)
A 45 m3 floor slab is situated over an intricate underfloor heating system. This intriguing project will be able to move on to the next phase with 150mm of sturdy RC40 mix.
Location: North Devon
Start Date: (Phase 1) 28th March 2023
Finish date: 28th March 2023
Brief job description: Concrete floor slab
Case Studies
Case Study 1
45 m3 floor slab
This 45 m3 floor slab is situated over an intricate underfloor heating system.
Case Study 2
Yard entry upgrade
The yard entry needs to be upgraded for a nearby fence constructor.