Case Study 1

45 m3 floor slab

A nice one day project (Phase 1)
A 45 m3 floor slab is situated over an intricate underfloor heating system. This intriguing project will be able to move on to the next phase with 150mm of sturdy RC40 mix.

Location: North Devon
Start Date: (Phase 1) 28th March 2023
Finish date: 28th March 2023
Brief job description: Concrete floor slab

 